A few pictures after we were all settled in...
Friday, March 4, 2011
Wednesday, March 2, 2011
Long overdue, final pictures...
Well, this is long overdue, but I figured I should complete the blog. We moved in December 15th and are all settled in now. We are looking forward to the snow melt, and will be busy chipping away at the landscaping and back porch over the summer... Heres some pictures of the final product, thanks for following along...
![]() |
Wide pine floors with a tung oil finish |
![]() |
Soapstone counter |
![]() |
Brown maple butcherblock island and back countertops |
![]() |
Double swinging pantry door that we found at Mason Brothers Architectural salvage and refinished |
![]() |
Former office, now Sawyers play room! |
![]() |
Pantry shelving and wine rack |
!
Labels:
beadboard,
butcher block,
countertop,
hinesburg,
pantry,
shelving,
shiplap,
soapstone,
tung oil,
vermont,
vermont farmhouse,
wide pine,
wine rack
Friday, November 12, 2010
Garage Doors
Garage doors are finally in... We got them from Limoge and Sons in Williston, be home a week from today to help finish up...
![]() |
Mudroom floor, still needs grout |
![]() |
Shop door |
![]() |
Master bath shower |
Labels:
garage doors,
gooseneck lights,
hinesburg,
subway,
tile,
vermont farmhouse
More finishing touches....
Tuesday, November 9, 2010
Outdoor Lights
Work continues on hanging the beadboard and shiplap inside. All the interior doors have been installed. Bathroom and mudroom tile should be done by the end of this week. The electrician started installing some lights yesterday, here are a few of the outside ones. We got them from Barnlightelectric.com, they have a great selection of reproduction vintage lighting.
![]() |
Garage door lights, doors should be installed next week |
![]() |
Mud room light installed |
Thursday, November 4, 2010
Details
Subscribe to:
Posts (Atom)