Just when things were starting to pick up... 12" of snow! Supposed to be 80 this weekend though, fingers crossed.
Thursday, April 29, 2010
Snow?
Just when things were starting to pick up... 12" of snow! Supposed to be 80 this weekend though, fingers crossed.
Labels:
footing,
foundation,
hinesburg,
ICF,
snow,
vermont farmhouse
Monday, April 26, 2010
Sunday, April 25, 2010
Thursday, April 22, 2010
Forming it up
Concrete is scheduled for today to pour the frost wall footing on the walk out end. As you can see in the pictures we had to step the footing down at the walk out end in order to keep it under the frost line. Joel Baker from Vermont ICF will be out friday to deliver the ICF's and help us get started forming them up.





Driveway all roughed in
Driveway all roughed in
Sunday, April 18, 2010
Ground Breaking!
We closed on the land Thursday and broke ground on Friday. Despite the wet weekend we made some progress. The driveway is cut in and the trench for the walkout end frost wall is dug. Here's some pictures...








Wednesday, April 14, 2010
Countdown
We have been very busy getting all the paperwork in order. We got our building permit this week and are all set to close on Thursday. We spent some time at the lot last week staking out where we plan on putting the house. Aas long as everything goes well Thursday, Parent Construction will be coming in early next week to dig our cellar hole. Stay tuned...
Monday, March 29, 2010
Update
Well. We've been busy over that last few weeks trying to get all our paperwork ready for the big dig. We have finally closed on our house in Maine and are just finalizing our financing. We are hoping to close on the land around April 13th and should get started shortly there after.
I will be headed home on Thursday, so we want to make the most of my time home by getting the project rolling. After weeks of trying to get pricing together and worrying about when our Maine house would close, I was pleasantly greeted with two bits of great news the other day, our mortgage had been approved, and almost as important, the golf course is open!
I will be headed home on Thursday, so we want to make the most of my time home by getting the project rolling. After weeks of trying to get pricing together and worrying about when our Maine house would close, I was pleasantly greeted with two bits of great news the other day, our mortgage had been approved, and almost as important, the golf course is open!
Sunday, March 7, 2010
Golf balls for sale...
Land Pictures
Thursday, March 4, 2010
Radiant Heat

I have been in contact with a company out of Barton, VT that supplies radiant heat systems. I had always wanted to use radiant if we ever built a house, but was under the impression that it was way too expensive. Much to my delight the Radiant Floor Company supplies system components and technical advice, allowing contractors and do it yourselfers to install much of the system with out the use of expensive plumbers or HVAC technicians.
After receiving their quote it looks like we will be able to install radiant heat in all three levels of the home. The basement will have radiant tubing laid within the slab and the main and upstairs level will have it running between the floor joists.
I was surprised to hear from them that the system they recommend uses a 200,000 BTU tankless water heater that will provide sufficient heat for the floors as well as the domestic hot water. The unit is made by a company called Takagi and is 95% efficient.
Tuesday, March 2, 2010

One of our goals while building is to create a home that is as efficient as possible. There are thousands of products available today to reduce electric and heating bills and we hope to use as many as possible to create a home that will provide minimal operating costs in the many years to come.
Our first step will be pouring the foundation and floors, we plan on using ICF's (insulated concrete forms) that will provide a high level of insulation in the basement. These will hold in a large amount of heat from the radiant coils that will be run through the basement slab, which would otherwise dissipate through an ordinary concrete wall and be lost outside.
Here is a short WIKI explanation of ICF's:
Insulating Concrete Forms (ICFs) are form work for concrete that stays in place as permanent building insulation for energy-efficient, cast-in-place, reinforced concrete walls, floors, and roofs.
The forms are interlocking modular units that are dry-stacked (without mortar) and filled with concrete. The forms lock together somewhat like Lego bricks and serve to create a form for the structural walls or floors of a building. Concrete is pumped into the cavity to form the structural element of the walls. Usually reinforcing steel (rebar) is added before concrete placement to give the concrete flexural strength, similar to bridges and high-rise buildings made of concrete (see Reinforced concrete). The forms are filled with concrete in 1–4 foot "lifts" to reduce the risk of blowouts like with other concrete form work. After the concrete has cured, or firmed up, the forms are left in place permanently for thermal efficiency.
Cupola

Every farmhouse needs a cupola. On a recent visit to Mason Brothers Architectural Salvage Warehouse Dani fell in love with this weather vane... Hopefully its still available when we go back.